Eastern Project

    Dover Heights  ·  Class 2 Apartment Renovation

    The Eastern Project in Dover Heights represents the second collaboration with this repeat client following the successful delivery of their family home in 2024.

    Having developed a strong working relationship built on trust and performance, the client engaged us again to deliver the renovation of their apartment with a defined budget spend under a do and charge arrangement.

    Design documentation and finishes schedules were provided by Studio Mim, establishing a refined material palette and clear architectural direction for the project.

    Eastern Project - fluted glass kitchen cabinetry
    Eastern Project - bathroom with fluted glass and terrazzo floor

    Scope & Reconfiguration

    The works involved a complete strip-out and internal renovation of the Class 2 apartment. With no structural works required, the focus of the project centred on elevating the quality of materials, craftsmanship, and detailing throughout the residence.

    As part of the reconfiguration of the layout, the existing large sunroom was converted into a third bedroom, significantly improving the functionality and value of the apartment while maintaining the integrity of the overall design.

    Eastern Project - quartzite kitchen sink with bridge tap
    Eastern Project - quartzite benchtop and splashback detail
    Eastern Project - fluted glass door joinery detail
    Eastern Project - pewter shower fixture with Carrara marble

    Material Selection

    A defining feature of the interior is the installation of engineered oak timber flooring laid in a herringbone pattern, creating a sense of movement and visual depth across the apartment while establishing a warm and timeless foundation to the space.

    • Engineered oak timber flooring in herringbone pattern
    • Quartzite benchtops and splashback to kitchen
    • Carrara marble tiles to bathroom
    • Pewter finish fixtures and fittings throughout kitchen and bathroom
    Eastern Project - rainfall showerhead detail
    Eastern Project - bathroom vanity with fluted glass screen
    Eastern Project - fluted glass and marble ledge detail
    Eastern Project - herringbone oak flooring detail

    Delivery & Outcome

    Delivered within the agreed budget framework, the project reflects a collaborative process between builder, designer, and client.

    The result is a carefully considered renovation that balances timeless materials with modern functionality, continuing the relationship with a valued repeat client through another successfully executed project.

    Eastern Project - fluted glass door with pewter hardware
    Eastern Project - alabaster wall sconce
    Eastern Project - mosaic tile and oak floor transition
    Eastern Project - bathroom vanity light fitting